A Long Thin Building and a Lot of Pavement

Freight in one side and out the other, with almost no storage. The building is narrow, the door count is high, and the yard is most of the project.

The geotechnical report, the intended clear height and the likely tenant profile. Those three tell us more than a full set of drawings.

The slab

The one element a tenant judges on, and cannot fix

Self-perform

Dewatering and deep foundations in house

Commodity

Fire protection designed to what is actually stored

Licensed

General contractor, licensed in the state of Florida

The pavement is the expensive part

A cross-dock building is comparatively simple. The truck yard around it carries continuous heavy axle loading, needs turning room for tractor-trailers at every door, and represents an enormous area of pavement. Under-designing it is the classic cross-dock mistake and it shows up as rutting within a couple of years.

What decides it

  • Door count, which drives building length.
  • Yard depth for trailer manoeuvring at every door.
  • Pavement design for continuous heavy axle loading.
  • Trailer parking, separate from the manoeuvring area.
  • Stormwater, over a very large impervious area.

How we handle it

  1. 01Design pavement to the actual loading, not to a commercial standard.
  2. 02Provide yard depth that works for the vehicles used.
  3. 03Separate manoeuvring from trailer storage.
  4. 04Coordinate stormwater over the whole paved area properly.
  5. 05Build dock equipment and levellers to a serviceable standard.

Design the pavement to actual axle loading with a proper subgrade assessment. Under-designed truck yards rut within a couple of years, and repaving a working terminal costs several times what building it correctly would have.

Said plainly

Where we stop

Florida stormwater retention over an area this size takes real land. If the site cannot accommodate both the yard and the retention, the door count comes down — and we will say so at the test-fit stage.

FAQ

Common questions

What is the biggest cost?
Usually the yard pavement, not the building.
How deep does the yard need to be?
Enough for tractor-trailer manoeuvring at every door. Test it against the actual vehicles.
Why do truck yards fail?
Under-designed pavement and subgrade. It ruts within a couple of years.
Does stormwater constrain the door count?
On a tight site, yes. Retention over that paved area takes real land.

Next step

Find out what is actually wrong with it.

An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.