What we build · Light Manufacturing

The Process Decides the Building

A building shaped by what happens inside it. Power, compressed air, process drainage and ventilation are the project; the shell is comparatively simple.

The geotechnical report, the intended clear height and the likely tenant profile. Those three tell us more than a full set of drawings.

The slab

The one element a tenant judges on, and cannot fix

Self-perform

Dewatering and deep foundations in house

Commodity

Fire protection designed to what is actually stored

Licensed

General contractor, licensed in the state of Florida

Process requirements arrive late and change everything

Manufacturing clients frequently finalize their equipment layout after the building design is well advanced. Power distribution, floor pits, drainage, compressed air and exhaust all follow that layout, and adding them into a designed building is far more expensive than designing around them.

What the process dictates

  • Electrical service and distribution, frequently far above a shell allowance.
  • Compressed air, process water and process drainage.
  • Floor loading and any pits or depressions for equipment.
  • Ventilation and exhaust for the specific process.
  • Crane or hoist provision, which is structural and must be early.

How we handle it

  1. 01Get the equipment layout before the structure is fixed.
  2. 02Design distribution to the actual load, not to an allowance.
  3. 03Coordinate pits, drainage and floor loading with the process.
  4. 04Provide crane structure at design, never as a retrofit.
  5. 05Sequence so process fit-out can start as early as possible.

If there may ever be a crane, put the structure in now. Adding overhead lifting capacity to a completed building means reinforcing columns and foundations in an occupied facility, and the cost difference is not close.

Said plainly

Where we stop

We will not design distribution against an equipment list marked provisional. It produces either a wasteful oversupply or a shortfall discovered at commissioning.

FAQ

Common questions

When do we need the equipment layout?
Before the structure is fixed. Power, pits and drainage all follow it.
What about a future crane?
Build the structure for it now. Retrofitting means reinforcing columns and foundations.
Is shell power usually enough?
Rarely for manufacturing. Design to the actual load.
Can process services be added later?
At much higher cost and disruption than designing around them.

Next step

Find out what is actually wrong with it.

An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.