What we build · Flex & Office-Warehouse

Two Buildings, One Envelope

Warehouse with an office component, built speculatively for tenants who do not exist yet. The flexibility is the product.

The geotechnical report, the intended clear height and the likely tenant profile. Those three tell us more than a full set of drawings.

The slab

The one element a tenant judges on, and cannot fix

Self-perform

Dewatering and deep foundations in house

Commodity

Fire protection designed to what is actually stored

Licensed

General contractor, licensed in the state of Florida

Building for a tenant you have not met

The office-to-warehouse ratio, the demising strategy and the door count all have to be chosen before anybody knows who will lease it. Choose wrong and you either spend on finish nobody wanted or hand every tenant an expensive fit-out that slows absorption.

What to decide up front

  • Office ratio, which the local market decides rather than the architect.
  • Demising strategy, so units can be split without rebuilding services.
  • Separate entries and parking for the office component.
  • Grade-level versus dock-high doors, and how many per unit.
  • Services stubbed so a split is straightforward later.

How we handle it

  1. 01Design demising so future splits are cheap rather than structural.
  2. 02Stub services for likely unit configurations.
  3. 03Build the shell to a standard that suits speculative leasing.
  4. 04Keep tenant fit-out simple and repeatable.
  5. 05Sequence so units can deliver as they lease.

Design the demising strategy before construction, not at first lease. Stubbing services for two or three likely configurations costs very little during the build and saves weeks of tenant fit-out on every unit afterwards.

Said plainly

Where we stop

If the office ratio is set well above what the local market absorbs, that finish is money spent on space that will be leased at warehouse rates. We will say so before it is built.

FAQ

Common questions

What office ratio should we build?
What your local market absorbs, not what looks balanced on a plan.
Should we demise up front?
Design for it up front, even if you do not build it. Stubbed services save weeks per tenant.
Grade level or dock high?
Depends on tenant profile. Most flex units want at least one of each.
Can units be combined later?
If the demising strategy allowed for it. That is a design decision.

Next step

Find out what is actually wrong with it.

An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.